Skip to content

How we work

Work that leaves a clear record.

Understand the building. Coordinate the equipment. Leave your team with the drawings, checks and access to keep it operating.

A single building cutaway with rooftop equipment, occupied floors and a central plant
Controls cabinet with wiring diagrams and an operator workstation
SOMA network drawing standard showing management, supervisory and field-controller layers with blank device referencesSOMA drawing standard
BuildingEquipmentRecordsBuilding and equipment are illustrative. The drawing preview comes from the SOMA drawing standard.

See how the work connects.

Follow the work from building to equipment to records. Inspect the drawing standard, blank checkout record and handoff examples along the way.

Understand the context

Find the connections before defining the work.

Review operating needs and trace the installed systems, equipment and available records into an agreed scope.

SOMA drawing standard

Network / riser architecture

SOMA network drawing standard showing management, supervisory and field-controller layers with blank device references
Sheet 05Drawing detail

Sheet 05 · SOMA drawing standard

Network / riser architecture

Open original PDF
Full sheet: SOMA network drawing standard showing management, supervisory and field-controller layers with blank device references

Zoom and scroll to inspect. The PDF retains the original vector detail.

From the published drawing setOpen original PDF
The result

A shared view of what exists and what should happen next.

Five steps. A continuous record.

Documentation stays with the work from the first walk-through to owner handoff.

  1. Discover & Assess

    Review the installed system, operating needs, risks, constraints, and available records. A Controls Assessment documents what exists and returns prioritized findings you own.

    Controls Assessment
  2. Plan & Design

    Before implementation, agree on scope, priorities, system architecture, responsibilities, phases, and acceptance criteria. Plan the work around building operations.

  3. Implement

    Carry out the modernization, integration, optimization, or support work agreed in the plan, in stages, retaining controllers that remain suitable for the system.

    View services
  4. Commission & Verify

    Test sequences, data, alarms, trends, integrations, graphics, and operator workflows against the intended result and the submittal.

    Blank functional checkout record
  5. Train & Hand Off

    Provide usable records, credentials, operator orientation, findings, and next-step recommendations so your team has the information and access to operate the system.

Included with project work

Project work follows a consistent closeout standard. Records are kept current throughout delivery so the handoff reflects what was installed.

Documented
Point lists, sequence narratives, network diagrams, and as-built records kept current as the work happens.
Commissioned
Sequences, alarms, trends, integrations, and graphics tested against the intended result before handoff.
Owner access and records
Owner credentials, system data, and access turned over to you at handoff.
Open and maintainable
Open protocols and documented integration paths the next contractor can read and maintain.
Operator training
Operator orientation on the screens, alarms, and workflows your team actually uses.
Records in your portal
Closeout records organized in your client portal alongside project status and deliverables.

Deliverables and responsibilities are agreed for the project. Open the client portal

Start with the work in front of you.

Bring us the building, the installed controls and the records you have. We’ll help define the scope and the next step.