
Higher Education & Campuses
Campus-wide building automation across different controller generations.
Common controls problems
Controls issues to consider when planning work for your buildings.
Mixed vintages
A campus can span several controller generations. Compatibility and hardware condition determine what can work together and stay in service.
Energy and rebates
Campus schedules and setbacks affect energy costs across many buildings. The energy office needs documented results and a clear account of rebate eligibility.
Semester rhythm
Campus occupancy changes with the academic calendar. Controls schedules should account for those changes when addressing energy waste.
How SOMA Controls helps
Connect older and newer buildings through a shared front end where the installed systems allow.
Review campus schedules and setpoints, with help preparing eligible rebate paperwork.
Give the energy office records to verify the results.
Recommended services
Explore the services relevant to your controls work.
- Energy & Sequence OptimizationOptimize
Campus scheduling and setpoint work, eligible rebate paperwork, and verification records for the energy office.
- Controls Retrofit & ModernizationModernize
Connect older and newer buildings through a shared front end where compatible, retaining viable controllers.
- Building Systems IntegrationIntegrate
A shared operator view across campus systems where compatibility and access allow.
Documentation and risk
- Documentation needs
A campus-wide points and sequence record across building eras.
Measurement and verification records for the energy office.
- Risk considerations
Energy waste across campus buildings adds to operating costs.
Each undocumented building era makes the next integration harder.